Fine Arts Center Construction:

Thanks to the dedication and generosity of our parents, and especially to the leadership gift from Michael and Laura Brader-Araje last year, MCS is proud to be able to build the final building in the Campaign to Complete the Community. This is the 4,000 square foot Fine Arts Center, that will provide a faculty work room and dedicated prepared environments for Art and Music.

 

Below we will put pictures of the actual construction as it takes place.

(Above) The Construction site in February. Red dirt is good soil. White dirt is processed fill on which the pad will be poured. The pad is half done and rolled. They are working on connecting sewer lines and other underground conduits.

(Below) The exterior wall footings are taking shape (March):

Machines are such fun to watch! Note tires off the ground.

 

(Below): the pad is poured.

What are all the white pipes sticking up (below)?

The area where the Fine Arts Center will be now has white pvc pipes for conduits for electricity, phone, and data, and other pipes for water coming in and waste water (from sinks, for example) going out and connected to the sewer lines. When the pad is poured, it will no longer be possible to get to the area under the building, so all that work needs to be done before the pad is poured.

 

THE WALLS ARE GOING UP!!

The roof is on! (below)

And the plumbing is almost done. Copper are water. White pvc are drain lines.

All the students signed the wall studs (below and to the right)


Below: the brick walls go up, roof going on, and the Art Room porch takes shape.

The front entrance to be:

Left: the exterior on the elementary playground side
Below: the soccer field under construction

 

The roof is almost complete and windows and doors are in.

The field is now grass!